Engineer Pete Cringle Cutting the steel beam to the required lengths for the structure that will support the giant T rocker in the Welsh Shaft. The machine being used is a petrol driven steel saw and is capable of cutting the section in about four minutes. The structure in the background is the Great Wheel.
|