The excavation.

After a period of neglect the level had flushed and silted up considerably.

The draw point and chute under the stope  has been disassembled to remove some large boulders. The end tipping ore truck could be wheeled directly under the chute for loading which would them be trammed out for tipping.

BACK           NEXT