Pages 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | 51 | 52 | 53 | 54 | 55 | 56 | 57 | 58 | 59 | 60 | 61 | 62 | 63 | 64

Above: The crew work on the bridge supports under floodlights during the winter nights.

Above: The stone work at the bridge opening is made good.

Above: The team start to deck over the main beams.

Above: Every fourth timber is set as a fly out to support the side stays.

Above: Alex Parkes core drilling into the concrete on the edge of the wheel case.

Above: The core holes form a collapse zone to make drilling the concrete easier.
The holes on each side of the wheel case will be for the aqueduct support legs.